Reconstruction with extension of the main building and attachment of the hotel complex with office premises
| 02.06.2009 |
The engineering and geological researches were initiated in accordance with the construction projects of the ETAP Hotel at Mechanizatoriv Str., Kyiv. These works included site engineering, drilling with the drilling pits, static probing, and laboratory researches.
As at June 9, 2009, 80% of pits are covered and the preparatory work for the static probing is in progress.
